A wet day which is what was promised so glad I had already decided to use it as a catch up day. All covers are made to date and ditto DVDs, I've filed the master covers and copies plus started on sorting out the last two weeks still photo haul. The orders have started flowing through post bank holiday weekend. I Went to the builders merchants in Northwich and got all the shelves required for the new room, this meant a lot of timber but at least the professional places charge and small percentage of B&Q rip off rates for this sort of thing. The shed is now full of timber, not a drop of rain shall touch it after we lost nearly all the actual shelf pieces I'd recovered from the old units. The cost of this stage was £179, we were amazed that although cut to size as promised they did it all by hand, at least I've got an electric saw for final trimming to size. We'll paint the shelving before installing it, a mass of caulking to go before I reach that stage but its looking good, here is a shot taken yesterday, remember it will be painted white most of this was recycled. There is another section out of shot to the left. The square door is to the electric consumer unit which I'll have to build round. Here are the latest DVD covers, all going on the shop tonight if my energy last out long enough. Comments are closed.
|
PMP Sponsors the North West Vehicle Restoration Trust at Kirkby.
Categories |